Skip to main content
Back to News
Member news

ABA backs major solar and battery-storage financing in Cambodia

ABA reports a US$47.5 million solar investment and a leading lending role in a separate US$182 million battery-storage facility.

ABA backs major solar and battery-storage financing in Cambodia
Representatives at SchneiTec Jupiter’s green infrastructure-bond listing event on 16 November 2026. Photo source: B2B Asia News.

Financing announcements: 12 and 17 November 2026 · Cambodia

ABA Bank has announced participation in two separate green-financing transactions supporting solar generation and planned battery storage in Cambodia. The November updates cover an operating solar project in Pursat and storage facilities planned for Pursat and Kampong Chhnang.

US$47.5 million for solar financing

In a release published on 17 November, ABA reported investing US$47.5 million in a US$150 million financing package for SchneiTec Jupiter’s 350 MW solar project in Pursat. The bank described itself as the transaction’s largest investor.

The solar financing combines bonds guaranteed by the Credit Guarantee and Investment Facility (CGIF), unguaranteed bonds and loans. ABA said the solar project was operational. A joint official release dates the bond-listing celebration at the Cambodia Securities Exchange to 16 November and identifies a US$99 million infrastructure bond within the US$150 million package.

A separate loan for planned storage

ABA’s 12 November release described its role as the largest single lender in a US$182 million syndicated green-loan facility for SchneiTec Legacy. Seven institutions are supporting the facility, jointly led by Bank of China (Hong Kong) Phnom Penh Branch and Bank of China (Hong Kong).

The project is planned to establish battery facilities with a combined storage capacity of 1,000 megawatt-hours across Pursat and Kampong Chhnang. ABA said the facilities are expected, once operational, to support the electricity grid and enable more renewable-energy integration.

The two announcements concern different SchneiTec Group subsidiaries and different financing structures. US$150 million and US$182 million are the respective total transaction sizes; ABA disclosed its US$47.5 million participation in the solar transaction but did not state its individual battery-loan amount in that release.

In pictures

Participants at SchneiTec Jupiter’s bond-listing event
SchneiTec Jupiter’s infrastructure-bond listing event at the Cambodia Securities Exchange on 16 November 2026. The US$99 million bond forms part of a US$150 million solar-financing package. Photo source: Global Green Growth Institute (GGGI).
Group at the SchneiTec Jupiter bond-listing ceremony
Participants at the Cambodia Securities Exchange ceremony marking SchneiTec Jupiter’s infrastructure-bond listing. Photo source: B2B Asia News.
Commemorative items recognising participants in the solar financing
A presentation item recognising ABA Bank’s role in SchneiTec Jupiter’s financing, photographed at the bond-listing event. Photo source: B2B Asia News.

Sources: ABA Bank · 2026-11-17; ABA Bank · 2026-11-12; Australian Embassy Cambodia and joint partners · 2026-11-16; Global Green Growth Institute · 2026-11-16; B2B Asia News · 2026-11-18.